The Pre-Dredge survey plan – the northern/inner harbor end of the channel The Pre-Dredge survey plan – the southern end of the channel Most of the dredging is focused on the gray areas. The Blue soundings are areas that do not need to be dredged as they are equal or deeper than the -9 foot depth at Mean Low Water (MLW). Its important to point out that the Pre-Dredge survey covers the entire length and width of the channel and some areas are heavily filled in (the dark gray areas as seen in the below plans) while other areas are lightly filled in (the green soundings). The Pre-Dredge survey completed showed just over 12,000 Cubic Yards that needed to be removed to maintain a controlling depth of -9 feet at Mean Low Water (MLW) throughout the channel. This harbor is a very important recreational and commercial port for Harwich, as well as for all of Cape Cod as thousands of boats use this harbor each season and keeping the channel clear of shoaling is critical. This is also our last project of the season. With the Allen Harbor project completed, the second and last project for Harwich is Saquatucket Harbor. Then use your Teleport Pebble, ride transport back for quest turn-in.Published on: JSand Shifter – Saquatucket Harbor Channel, Harwich Only need to kill him twice, and no risks. When coming down that ramp, kill guy on left, and camp the spot until you have 8. Note: At ( -296, 469, -357 ) Copy /waypoint -296, 469, -357, there is an ore sample by itself that respawns about every 20 seconds Harvest 8 samples of the ore being mined by the slobberjaw drudges near ( -407, 479, -265 ) Copy /waypoint -407, 479, -265, northeast of the Erudin Gardens.Part of: The Stonebrunt Highlands Timeline EverQuest 2 Quest Information Journal Category
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |